Limekiln BESS Application August 2025
Volume 1 – Written Statement
Chapter 1 Introduction
Chapter 2 Site Description
Chapter 3 Description of the Proposed Development
Chapter 4 Forestry
Chapter 5 Landscape and Visual Appraisal
Chapter 6 Ecology
Chapter 7 Ornithology
Chapter 8 Cultural Heritage DBA
Chapter 9 Geology and Peat
Chapter 10 Hydrology and Hydrogeology
Chapter 11 Noise
Chapter 12 Transport Statement and CTMP
Chapter 13 Socio-Economics
Chapter 14 Outline Battery Safety Management Plan
Volume 2 – Figures and Visualisations
Figure 2.1 Site Boundary
Figure 2.2 Site Location
Figure 2.3 Proposed Development and Limekiln Wind Farm
Figure 4.1 Forestry Study Area
Figure 4.2 Forestry Baseline Species
Figure 4.3 Forestry Felling
Figure 4.4 Forestry Replanting
Figure 6.1 Phase 1 Survey Results
Figure 6.2 Statutory Site Plan
Figure 8.1 Designated Heritage Assets
Figure 8.2 Non Designated Heritage Assets
Figure 9.1 Soils
Figure 9.3 Peatland Classification
Figure 9.4 Bedrock Geology
Figure 10.1 Local Hydrology
Figure 10.2 Regional Hydrogeology
Figure 10.3 Groundwater Vulnerability
Figure 11.1 Receptors and BESS Area
Volume 3 – Appendices
Appendix 5.2 LVA Figures
Appendix 5.3 VP Figures_Part 1 of 3
Appendix 5.3 VP Figures_Part 2 of 3
Appendix 5.3 VP Figures_Part 3 of 3
Appendix 7.1 Ornithology Technical Report
Appendix 8.1 Gazeteer
Appendix 9.1 Peat
Figure 10.1 Local Hydrology
Planning Application Drawings
Location Plan
Site Plan
Site Plan Detail
Indicative BESS Platform Layout
Indicative Substation Extension Layout
Indicative BESS Platform Layout
Indicative Substation Extension Layout
Indicative Control Room Plan and Elevations
Indicative Power Conversion System Details
Indicative BESS Container Details
Proposed Access Track Cross Section Detail
Indicative BESS and PCS Foundations Plan and Sections
Indicative BESS Platform Earthworks
Indicative Substation Extension Platform Earthworks
Indicative Fence Detail
Indicative Lighting and CCTV Column Detail
Pre-Application Consultation Report
Pre Application Consultation Report
Pre Application Consulation Report_Appendices